Crude Oil Tanker
Chemical Tanker
Liquefied Natural Gas (LNG) Carrier
Compressed Natural Gas (CNG) Carrier
Liquefied Petroleum Gas (LPG) Carrier
Bulk Carrier
Bulk Carrier with cranes
Combination Ore-Bulk-Oil (OBO) Carrier
Container Ship
Pure Car & Truck Carrier (PCTC) (RoRo)
Reefer Ship
Multipurpose Twin Deck Vessel
Cruise Ship
Car Passenger Ship (RoPax Ferry)
Car Passenger high speed Catamaran
Open Type Car Passenger Ferry
Hydrofoil vessel
SWATH (Small Waterplane Area Twin Hull)
Low Sulphur HFO, MDO, MGO change-over fuel & exhaust scrubber
Dual fuel LNG / VOC Shuttle Tanker
Dual fuel LNG/diesel Bulk Carrier with shaft generators
Dual fuel diesel/methanol MR tanker
Hybrid diesel-battery Ferry
Pure electric (plug-in battery) Bunker Vessel
Diesel And Gas Turbine (CODAG) & Battery Hybrid Patrol Vessel 
Fincantieri - Paolo Thaon di Revel
Nuclear powered submarine
Unmanned Autonomous (remote controlled) Vessel
Hydrogen & Solar-Wind-Wave powered Ship (project)

© Copyright Andreas Chronis